Talan Venn opens the ridge transects and the notes attached to older stakes at the northern ridge survey path. Before anyone changes a mark, the crew checks a new marker sits one branch-width beyond the last clear-cut record. The seedfall period sets the pace of the work.
The page holds 99 survey points paired with a date and weather reading. Talan Venn reads the preceding count, 104, before the next line is entered. A number without a date would not tell the next crew what changed.
The current transect records a wider canopy. Older notes were taken from a lower path and cannot be compared without adjustment. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.
The circle publishes options with the seasonal limits stated beside them. The Year first, seedfall window 2 file remains open for its scheduled decision. The survey circle will publish a crosswalk between the old path and the new transect.
The shift closes with the source page attached to the board. The next file uses a new date and scope.