Oren Leth opens spring flow marks and the sample jars held by two circles at the Lethariel source springs. Before anyone changes a mark, the crew checks the same spring feeds a public bath and a teaching plot. The seedfall period sets the pace of the work.

The page holds 19 samples with a chain of custody from spring to room. Oren Leth reads the preceding count, 17, before the next line is entered. A number without a date would not tell the next crew what changed.

Bath stewards test for safe use. Gardeners also track mineral changes that affect the teaching plot. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.

Anew seasonal file opens with a named site and a dated measure. The Year first, seedfall window 3 file remains open for its scheduled decision. The next report will separate the common safety measure from each use-specific reading.

The shift closes with the source page attached to the board. The next file uses a new date and scope.