Thalen Moss opens the pact, spring marks and the field notes kept by both circles at the boundary spring at Alder Pass. Before anyone changes a mark, the crew checks the downstream mark lags when the upper spring is measured after rain. The seedfall period sets the pace of the work.

The page holds 55 draws recorded with both spring and downstream marks. Thalen Moss reads the preceding count, 53, before the next line is entered. A number without a date would not tell the next crew what changed.

Upper stewards rely on the spring reading. Lower households rely on the mark that reaches their cistern. Here the difference is visible between the posted rule and the route, service or shift just beyond the door.

The circle publishes options with the seasonal limits stated beside them. The Year first, seedfall window 1 file remains open for its scheduled decision. Both circles will take paired measurements on the same morning.

The shift closes with the source page attached to the board. The next file uses a new date and scope.