The first file on the bridge shelter rooms began with the room key ledger and the bridge repair calendar. The city then checked the source, heard affected residents and sent a second office to repeat the count.

The current Year fourth, budbreak window 2 file records 48 rooms available during a scheduled repair closure; the previous window records 45. The longer sequence makes the change visible, while each count remains tied to its own dates.

A turning point was the observation that the bridge crew stores repair timber in one unused room. It narrowed the discussion from a general claim to a question about how the rule works at the site.

Masons need dry storage close to the work. Residents ask the city to keep one room available for families displaced by rain. The shared record is larger than it was at the start, although the parties still assign it different weight.

The clerk closes this file and gives the next season a fresh scope. The board closed this docket after it sent one separate question to a later public hearing without reopening this file. The next window starts with a fresh record.